LFR website header mark projection v0.1 The frozen canonical centrelines rendered with a 16 source-pixel body for 40 to 64 CSS pixel website-header use. {"body_width_source_pixels":16.0,"claim_boundary":"Declared website-header application projection; not canonical geometry or favicon authority.","schema":"lfr_website_header_mark_projection_v0_1","source":"canonical_generative_state_v0.1.svg","source_sha256":"7731103E48C5BDEB68CCF4D5D059B4CA83C2BDCB82C954228EBFE5A09E3C4087","status":"APPLICATION_PROJECTION_40_TO_64_CSS_PX_ONLY","taper_degrees":28.0,"valid_css_px":[40,64]}
LFR Resonance Systems
GB grid public-duty observation · lfrfrequency.com
Grid Continuity Status Card

How balancing work is organised in the public GB record

A selected-claim summary projection · 2026-07-15 .. 2026-08-13 (30 complete UTC days, inclusive; window_end exclusive = 2026-08-14)
GB · 2026-08-14
PUBLIC OBSERVATION
system-level · zero named units

Supply role

Transmission-level FUELHH supply shares. These categories describe recorded supply, not balancing participation.

Gas
28.5%
Wind
24.0%
Nuclear
15.5%
Interconnect
17.9%

Balancing role

Two views of the same registered high-confidence storage lens in the public BM record.

Accepted-action count
36.4%
Instructed-trajectory energy
3.3%

Same population identity; different denominators and units. Side by side, not subtractable. The storage lens is not an estimate of every GB battery asset.

Distribution across participants

Accepted actions were distributed across the observed BM-unit population as follows.

Effective units (1/HHI)
153
Units with accepted actions
504

The effective count is 1/HHI over accepted-action shares. It does not establish ownership diversity, operational resilience or physical redundancy.

Public visibility boundary

Visible in this projection
  • Transmission-level supply categories.
  • Accepted-action count and instructed-trajectory energy under named public procedures.
  • Distribution across BM-unit identifiers in the accepted-action record.
Not established here
  • Individual asset delivery, BMS or SCADA state.
  • A complete identity census of GB battery assets.
  • Dispatch causality, condition, reliability, credit or future outcome.